{"id":111509,"date":"2025-11-21T14:08:10","date_gmt":"2025-11-21T14:08:10","guid":{"rendered":"https:\/\/ekamu.net\/?p=111509"},"modified":"2025-11-21T14:08:10","modified_gmt":"2025-11-21T14:08:10","slug":"turkiyenin-ilk-yuzer-gesi-dahil-8-projeyle-650-mw-kapasite-geliyor","status":"publish","type":"post","link":"https:\/\/ekamu.net\/index.php\/2025\/11\/21\/turkiyenin-ilk-yuzer-gesi-dahil-8-projeyle-650-mw-kapasite-geliyor\/","title":{"rendered":"T\u00fcrkiye\u2019nin ilk y\u00fczer GES\u2019i dahil 8 projeyle 650 MW kapasite geliyor"},"content":{"rendered":"<p><figure> <span> <img decoding=\"async\" src=\"https:\/\/ekamu.net\/wp-content\/uploads\/2025\/11\/turkiyenin-ilk-yuzer-gesi-dahil-8-projeyle-650-mw-kapasite-geliyor-0-7srPJrE1.jpg\"\/> <\/span> Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan y\u00fcr\u00fct\u00fclen Yenilenebilir Enerji Kaynak Alan\u0131 (YEKA) modeli \u00e7er\u00e7evesinde, toplam <strong>8 projeye<\/strong> 38 \u015firketten <strong>77 ba\u015fvuru<\/strong> yap\u0131ld\u0131. Bu projeler Bolu, Erzurum, Eski\u015fehir, Kahramanmara\u015f, Mardin, Van ve Manisa illerinde yer al\u0131yor ve <strong>toplamda 650 MW kapasite<\/strong> yat\u0131r\u0131mc\u0131lara tahsis edilecek. Ba\u015fvuru s\u00fcrecinin tamamlanmas\u0131n\u0131n ard\u0131ndan detayl\u0131 evrak incelemeleri yap\u0131larak yar\u0131\u015fmalar\u0131n gelecek hafta ger\u00e7ekle\u015ftirilmesi planlan\u0131yor. <\/figure>\n<p><b>7 \u015fehre GES yap\u0131lacak<\/b><\/p>\n<p>\u0130hale kapsam\u0131nda belirlenen fiyatlar da duyuruldu. Sekiz proje i\u00e7in ba\u015flang\u0131\u00e7 tavan fiyat\u0131 kilovatsaat ba\u015f\u0131na 5,50 avro-cent, taban fiyat ise 3,25 avro-cent olarak belirlendi. T\u00fcm yar\u0131\u015fmalarda taban fiyat sa\u011flanmas\u0131 durumunda, megavat ba\u015f\u0131na katk\u0131 pay\u0131 art\u0131rma ba\u015flang\u0131\u00e7 fiyat\u0131 10 bin avro olacak. Kazanan yat\u0131r\u0131mc\u0131lar, s\u00f6zle\u015fme imza tarihinden itibaren 60 ay boyunca serbest piyasada elektrik sat\u0131\u015f\u0131 yapabilecek, ard\u0131ndan ise 20 y\u0131ll\u0131k elektrik enerjisi al\u0131m s\u00fcresi ba\u015flayacak.<\/p>\n<p>YEKA GES-2025\u2019in en dikkat \u00e7eken projelerinden biri T\u00fcrkiye\u2019nin ilk y\u00fczer g\u00fcne\u015f enerjisi santrali <strong>Demirk\u00f6pr\u00fc Y\u00fczer GES<\/strong> oldu. Proje, <strong>Manisa<\/strong>\u2019daki mevcut hidroelektrik santral rezervuar\u0131na entegre edilecek ve <strong>35 MW<\/strong> kapasiteye sahip olacak. Y\u00fczer GES i\u00e7in 11 ba\u015fvuru yap\u0131ld\u0131. Bu yat\u0131r\u0131m\u0131n \u00f6n\u00fcn\u00fc a\u00e7an de\u011fi\u015fiklik, ge\u00e7en y\u0131l K\u0131y\u0131 Kanunu\u2019nda yap\u0131lan d\u00fczenleme ile denizler, baraj g\u00f6lleri, suni ve do\u011fal g\u00f6llerde yenilenebilir enerji tesislerinin kurulabilmesini sa\u011flad\u0131.<\/p>\n<p>Enerji ve Tabii Kaynaklar Bakan\u0131 Alparslan Bayraktar, <strong>g\u00fcne\u015f ve r\u00fczgar<\/strong> kurulu g\u00fcc\u00fcnde <strong>38 GW<\/strong>\u2019\u0131n a\u015f\u0131ld\u0131\u011f\u0131n\u0131 ve <strong>2035&#8217;te 120 GW\u2019a<\/strong> ula\u015fmay\u0131 hedeflediklerini belirtti. \u00d6te yandan, r\u00fczgar enerjisi santrallerine ili\u015fkin YEKA RES-2025 i\u00e7in ba\u015fvurular 2 Aral\u0131k&#8217;ta al\u0131nacak.<\/p>\n<ul>\n<li>G25-Bolu GES: 50 MW<\/li>\n<li>G25-Erzurum-1 GES: 100 MW<\/li>\n<li>G25-Erzurum-3 GES: 85 MW<\/li>\n<li>G25-Eski\u015fehir GES: 260 MW<\/li>\n<li>G25-Kahramanmara\u015f GES: 40 MW<\/li>\n<li>G25-Mardin GES: 40 MW<\/li>\n<li>G25-Van GES: 40 MW<\/li>\n<li>YG25-Demirk\u00f6pr\u00fc Y\u00fczer GES: 35 MW<\/li>\n<\/ul>\n<p><span style=\"display: block; width: 343.125px; color: rgb(55, 58, 60); font-size: 14px; background-color: rgb(255, 249, 236);\"><\/span><\/p>\n<p>Kaynak :\u00a0<span style=\"background-color: rgb(255, 249, 236); color: rgb(55, 58, 60); font-size: 14px;\">https:\/\/www.donanimhaber.com\/turkiye-8-ges-projesiyle-650-mw-kapasite-ekleyecek&#8211;198839<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan y\u00fcr\u00fct\u00fclen Yenilenebilir Enerji Kaynak Alan\u0131 (YEKA) modeli \u00e7er\u00e7evesinde, toplam 8 projeye 38 \u015firketten 77 ba\u015fvuru yap\u0131ld\u0131. Bu projeler Bolu, Erzurum, Eski\u015fehir, Kahramanmara\u015f, Mardin, Van ve Manisa &#8230;<\/p>\n","protected":false},"author":1,"featured_media":111510,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[137,116,4286,181],"class_list":["post-111509","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-teknoloji","tag-enerji","tag-fiyat","tag-ges","tag-proje"],"_links":{"self":[{"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/posts\/111509","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/comments?post=111509"}],"version-history":[{"count":1,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/posts\/111509\/revisions"}],"predecessor-version":[{"id":111512,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/posts\/111509\/revisions\/111512"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/media\/111510"}],"wp:attachment":[{"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/media?parent=111509"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/categories?post=111509"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/tags?post=111509"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}