{"id":115861,"date":"2025-12-29T20:52:11","date_gmt":"2025-12-29T20:52:11","guid":{"rendered":"https:\/\/ekamu.net\/?p=115861"},"modified":"2025-12-29T20:52:11","modified_gmt":"2025-12-29T20:52:11","slug":"cinde-1-gwlik-dunyanin-en-buyuk-acik-deniz-gunes-enerjisi-projesi-hizmete-girdi","status":"publish","type":"post","link":"https:\/\/ekamu.net\/index.php\/2025\/12\/29\/cinde-1-gwlik-dunyanin-en-buyuk-acik-deniz-gunes-enerjisi-projesi-hizmete-girdi\/","title":{"rendered":"\u00c7in&#8217;de 1 GW&#8217;l\u0131k d\u00fcnyan\u0131n en b\u00fcy\u00fck a\u00e7\u0131k deniz g\u00fcne\u015f enerjisi projesi hizmete girdi"},"content":{"rendered":"<p><figure> <span> <img decoding=\"async\" src=\"https:\/\/ekamu.net\/wp-content\/uploads\/2025\/12\/cinde-1-gwlik-dunyanin-en-buyuk-acik-deniz-gunes-enerjisi-projesi-hizmete-girdi-0-x2Cwn4w3.jpg\"\/> <\/span> \u00c7in&#8217;in ilk gigawatt kapasiteli <strong>a\u00e7\u0131k deniz g\u00fcne\u015f enerjisi santrali <\/strong>hizmete girdi.\u00a0\u00c7in&#8217;in do\u011fusundaki Shandong eyaletinin Dongying \u015fehrine ba\u011fl\u0131 Kenli b\u00f6lgesinin a\u00e7\u0131klar\u0131nda yer alan proje, <strong>1.200 hektardan<\/strong> fazla bir alan\u0131 kaps\u0131yor. <\/figure>\n<p><b>Deniz taban\u0131na sabitlenmi\u015f panellerde olu\u015fuyor<\/b><\/p>\n<p>China Energy Investment \u015firketi taraf\u0131ndan geli\u015ftirilen <strong>1 GW <\/strong>kapasiteli HG14 a\u00e7\u0131k deniz g\u00fcne\u015f enerjisi santrali, ge\u00e7ti\u011fimiz g\u00fcnlerde tam kapasiteyle \u015febekeye ba\u011fland\u0131.\u00a0Tesis, k\u0131y\u0131dan yakla\u015f\u0131k<strong> 8 kilometre a\u00e7\u0131kta<\/strong>, deniz derinli\u011finin <strong>1 ila 4 metre <\/strong>aras\u0131nda de\u011fi\u015fti\u011fi s\u0131\u011f sularda yer al\u0131yor.<\/p>\n<p>HG14, \u00c7in\u2019in ilk gigavat \u00f6l\u00e7ekli<strong> sabit kaz\u0131kl\u0131<\/strong> a\u00e7\u0131k deniz PV santrali olmas\u0131n\u0131n yan\u0131 s\u0131ra, ulusal \u00fc\u00e7 boyutlu deniz kullan\u0131m hakk\u0131 \u00e7er\u00e7evesinde onaylanan ilk a\u00e7\u0131k deniz g\u00fcne\u015f enerjisi tesisi olma \u00f6zelli\u011fini ta\u015f\u0131yor. Projenin toplam yat\u0131r\u0131m tutar\u0131 yakla\u015f\u0131k <strong>8,1 milyar yuan (yakla\u015f\u0131k 1,2 milyar dolar) <\/strong>olarak bildiriliyor.<\/p>\n<figure> <span> <img decoding=\"async\" src=\"https:\/\/ekamu.net\/wp-content\/uploads\/2025\/12\/cinde-1-gwlik-dunyanin-en-buyuk-acik-deniz-gunes-enerjisi-projesi-hizmete-girdi-1-mmwKiZDn.jpg\"\/> <\/span> Santral, her biri 60 x 35 metre boyutlar\u0131nda olan<strong> 2.934 \u00e7elik PV platformundan<\/strong> olu\u015fuyor. Bu platformlar, toplam <strong>11.736 \u00e7elik kaz\u0131k<\/strong> ile deniz taban\u0131na sabitlenmi\u015f durumda. Sabit kaz\u0131kl\u0131 yap\u0131, r\u00fczgar, dalga, gelgit ve kuzey k\u0131y\u0131lar\u0131nda g\u00f6r\u00fclen mevsimsel deniz buzuna kar\u015f\u0131 y\u00fcksek dayan\u0131m sa\u011flayarak a\u00e7\u0131k deniz g\u00fcne\u015f projelerinin temel m\u00fchendislik zorluklar\u0131n\u0131 \u00e7\u00f6z\u00fcyor. <\/figure>\n<p><b>2,3 milyondan fazla g\u00fcne\u015f paneli yer al\u0131yor<\/b><\/p>\n<p>Tesiste, 15 derece e\u011fimle monte edilmi\u015f\u00a0<strong>2,3 milyondan fazla\u00a0710 W g\u00fcc\u00fcnde n-tipi \u00e7ift y\u00fczl\u00fc fotovoltaik mod\u00fcl <\/strong>yer al\u0131yor.\u00a0Proje verilerine g\u00f6re, deniz \u00fczerindeki daha d\u00fc\u015f\u00fck s\u0131cakl\u0131klar ve su y\u00fczeyinden gelen yans\u0131t\u0131c\u0131 etki sayesinde, \u00fcretim verimlili\u011fi karadaki benzer sistemlere k\u0131yasla <strong>%5 ila %15 daha y\u00fcksek.<\/strong><\/p>\n<p>\u00dcretilen elektrik, 66 kV\u2019luk deniz alt\u0131 kablolar\u0131 ve karadaki iletim hatlar\u0131 arac\u0131l\u0131\u011f\u0131yla 220 kV\u2019luk bir trafo merkezine aktar\u0131l\u0131yor. Ayr\u0131ca projeye entegre edilen <strong>100 MW \/ 200 MWh kapasiteli enerji depolama sistemi<\/strong>, \u015febeke kararl\u0131l\u0131\u011f\u0131n\u0131 ve enerji sevk esnekli\u011fini art\u0131r\u0131yor. Bu iletim altyap\u0131s\u0131n\u0131n, kapasiteyi %20 oran\u0131nda art\u0131r\u0131rken, birim maliyetleri %15 d\u00fc\u015f\u00fcrd\u00fc\u011f\u00fc belirtiliyor.<\/p>\n<p>Santralin\u00a0<strong>y\u0131ll\u0131k yakla\u015f\u0131k 1,78 TWh elektrik \u00fcretmesi<\/strong> bekleniyor. Bu miktar, Kenli il\u00e7esinin elektrik ihtiyac\u0131n\u0131n yakla\u015f\u0131k<strong> %60\u2019\u0131n\u0131 <\/strong>kar\u015f\u0131l\u0131yor. Proje sayesinde her y\u0131l 1,34 milyon ton CO\u2082 sal\u0131m\u0131 \u00f6nlenirken, 500 bin tondan fazla k\u00f6m\u00fcr tasarrufu sa\u011flan\u0131yor. Tesis ayr\u0131ca,<strong> \u201c\u00fcstte g\u00fcne\u015f paneli, altta su \u00fcr\u00fcnleri yeti\u015ftiricili\u011fi\u201d<\/strong> yakla\u015f\u0131m\u0131n\u0131 benimseyerek deniz alanlar\u0131n\u0131n \u00e7ift ama\u00e7l\u0131 kullan\u0131m\u0131na olanak tan\u0131yor.<\/p>\n\n<p><span style=\"display: block; width: 343.125px; color: rgb(55, 58, 60); font-size: 14px; background-color: rgb(255, 249, 236);\">https:\/\/www.youtube.com\/embed\/UB81XPXaFvg<\/span><\/p>\n<p>Kaynak :\u00a0<span style=\"background-color: rgb(255, 249, 236); color: rgb(55, 58, 60); font-size: 14px;\">https:\/\/www.donanimhaber.com\/cin-de-devasa-acik-deniz-gunes-enerjisi-projesi-hizmete-girdi&#8211;200273<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u00c7in&#8217;in ilk gigawatt kapasiteli a\u00e7\u0131k deniz g\u00fcne\u015f enerjisi santrali hizmete girdi.\u00a0\u00c7in&#8217;in do\u011fusundaki Shandong eyaletinin Dongying \u015fehrine ba\u011fl\u0131 Kenli b\u00f6lgesinin a\u00e7\u0131klar\u0131nda yer alan proje, 1.200 hektardan fazla bir alan\u0131 kaps\u0131yor. Deniz taban\u0131na &#8230;<\/p>\n","protected":false},"author":1,"featured_media":115862,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[338,137,469,181,1543],"class_list":["post-115861","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-teknoloji","tag-deniz","tag-enerji","tag-gunes","tag-proje","tag-yaklasik"],"_links":{"self":[{"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/posts\/115861","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/comments?post=115861"}],"version-history":[{"count":1,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/posts\/115861\/revisions"}],"predecessor-version":[{"id":115865,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/posts\/115861\/revisions\/115865"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/media\/115862"}],"wp:attachment":[{"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/media?parent=115861"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/categories?post=115861"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/tags?post=115861"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}