{"id":117517,"date":"2026-01-10T16:08:10","date_gmt":"2026-01-10T16:08:10","guid":{"rendered":"https:\/\/ekamu.net\/?p=117517"},"modified":"2026-01-10T16:08:10","modified_gmt":"2026-01-10T16:08:10","slug":"turkiye-2025te-gunes-enerjisinde-47-gwlik-yeni-kurulum-gerceklestirdi","status":"publish","type":"post","link":"https:\/\/ekamu.net\/index.php\/2026\/01\/10\/turkiye-2025te-gunes-enerjisinde-47-gwlik-yeni-kurulum-gerceklestirdi\/","title":{"rendered":"T\u00fcrkiye, 2025\u2019te g\u00fcne\u015f enerjisinde 4,7 GW\u2019l\u0131k yeni kurulum ger\u00e7ekle\u015ftirdi"},"content":{"rendered":"<p><figure> <span> <img decoding=\"async\" src=\"https:\/\/ekamu.net\/wp-content\/uploads\/2026\/01\/turkiye-2025te-gunes-enerjisinde-47-gwlik-yeni-kurulum-gerceklestirdi-0-ZeyJanhp.jpg\"\/> <\/span> <strong>T\u00fcrkiye<\/strong>, 2025 y\u0131l\u0131nda g\u00fcne\u015f enerjisinde g\u00fc\u00e7l\u00fc b\u00fcy\u00fcmesini s\u00fcrd\u00fcrerek <strong>4.694 MW<\/strong> yeni kurulum ger\u00e7ekle\u015ftirdi. T\u00fcrkiye Elektrik \u0130letim A\u015e (TE\u0130A\u015e) verilerine g\u00f6re bu art\u0131\u015fla birlikte \u00fclkenin toplam <strong>kurulu g\u00fcne\u015f g\u00fcc\u00fc 24.795 MW<\/strong>\u2019a ula\u015ft\u0131 ve 25 GW s\u0131n\u0131r\u0131na yakla\u015ft\u0131. <\/figure>\n<p><b>G\u00fcne\u015fte ivme s\u00fcr\u00fcyor<\/b><\/p>\n<p>2025\u2019in ilk alt\u0131 ay\u0131nda 3,1 GW\u2019l\u0131k yeni kapasite devreye al\u0131n\u0131rken, T\u00fcrkiye y\u0131l\u0131n hen\u00fcz haziran ay\u0131 sonunda y\u0131ll\u0131k kurulum hedefini a\u015fmay\u0131 ba\u015fard\u0131. 2025\u2019te devreye al\u0131nan g\u00fcne\u015f enerjisi kapasitesinin 4.175 MW\u2019l\u0131k b\u00f6l\u00fcm\u00fc, \u00f6z t\u00fcketime y\u00f6nelik lisanss\u0131z santrallerden olu\u015ftu. Bu santrallerle birlikte T\u00fcrkiye\u2019deki toplam lisanss\u0131z g\u00fcne\u015f enerjisi kapasitesi 22.255 MW\u2019a y\u00fckseldi. Ember enerji analisti Bahad\u0131r Sercan G\u00fcm\u00fc\u015f, bu rakam i\u00e7inde konut tipi g\u00fcne\u015f enerjisinin pay\u0131n\u0131n ihmal edilebilir d\u00fczeyde oldu\u011funu vurgulayarak neredeyse t\u00fcm lisanss\u0131z kurulumlar\u0131n ticari ve end\u00fcstriyel (C&#038;I) segmentten geldi\u011fini belirtti.<\/p>\n<figure> <span> <img decoding=\"async\" src=\"https:\/\/ekamu.net\/wp-content\/uploads\/2026\/01\/turkiye-2025te-gunes-enerjisinde-47-gwlik-yeni-kurulum-gerceklestirdi-1-nQ2Ojb7L.jpg\"\/> <\/span> 2025 y\u0131l\u0131nda kurulan kapasitenin kalan 521 MW\u2019l\u0131k k\u0131sm\u0131 lisansl\u0131 g\u00fcne\u015f enerjisi santrallerinden geldi. Bu eklemelerle birlikte T\u00fcrkiye\u2019deki toplam lisansl\u0131 g\u00fcne\u015f enerjisi g\u00fcc\u00fc 2.540 MW\u2019a ula\u015ft\u0131. <\/figure>\n<p>G\u00fcm\u00fc\u015f, 2026 y\u0131l\u0131nda lisansl\u0131 g\u00fcne\u015f enerjisi kapasitesinde belirgin bir hareketlilik \u00f6ng\u00f6r\u00fcyor. Bu beklentinin temelinde, ge\u00e7mi\u015f y\u0131llarda yap\u0131lan Yenilenebilir Enerji Kaynak Alan\u0131 (YEKA) ihalelerinden gelen ve 2 GW\u2019\u0131n \u00fczerinde b\u00fcy\u00fckl\u00fc\u011fe ula\u015fan proje havuzu yer al\u0131yor. Ayr\u0131ca, yakla\u015f\u0131k 15 GW kapasiteye kar\u015f\u0131l\u0131k gelen ve depolama sistemleriyle entegre g\u00fcne\u015f santrallerinin \u00f6n lisans alm\u0131\u015f olmas\u0131 da piyasadaki potansiyeli g\u00fc\u00e7lendiriyor.<\/p>\n<p><b>Kurulu g\u00fcc\u00fcn y\u00fczde 62\u2019si temiz enerji<\/b><\/p>\n<p>Aral\u0131k 2025 sonu itibariyle g\u00fcne\u015f enerjisi; 24.79 GW, r\u00fczgar enerjisi; 14.55 GW, hidroelektrik; 32.29 GW, jeotermal; 1.76 GW, biyok\u00fctle; 2.12 GW, do\u011falgaz; 23.98 GW, yerli k\u00f6m\u00fcr; 11.47 GW ve ithal k\u00f6m\u00fcr; 10.46 GW kurulu g\u00fcce sahip.<\/p>\n<p>T\u00fcrkiye\u2019nin toplam elektrik kurulu g\u00fcc\u00fc yakla\u015f\u0131k <strong>121.4 GW <\/strong>olarak ger\u00e7ekle\u015fti. Bu toplam i\u00e7inde g\u00fcne\u015f, r\u00fczg\u00e2r, hidroelektrik, jeotermal ve biyok\u00fctle gibi <strong>yenilenebilir ve temiz <\/strong>enerji kaynaklar\u0131n\u0131n toplam kurulu g\u00fcc\u00fc <strong>75.5 GW\u2019<\/strong>a ula\u015ft\u0131. Bu tabloya g\u00f6re T\u00fcrkiye\u2019deki toplam kurulu g\u00fcc\u00fcn yakla\u015f\u0131k <strong>y\u00fczde 62,2\u2019si yenilenebilir ve temiz enerji<\/strong> kaynaklar\u0131ndan olu\u015fuyor. T\u00fcrkiye, 2035\u2019te 120 GW yenilenebilir enerji kurulu g\u00fcce ula\u015fmay\u0131 hedefliyor.<\/p>\n\n<p><span style=\"display: block; width: 343.125px; color: rgb(55, 58, 60); font-size: 14px; background-color: rgb(255, 249, 236);\"><\/span><\/p>\n<p>Kaynak :\u00a0<span style=\"background-color: rgb(255, 249, 236); color: rgb(55, 58, 60); font-size: 14px;\">https:\/\/www.donanimhaber.com\/turkiye-2025-te-guneste-4-7-gw-lik-yeni-kurulum-gerceklestirdi&#8211;200714<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>T\u00fcrkiye, 2025 y\u0131l\u0131nda g\u00fcne\u015f enerjisinde g\u00fc\u00e7l\u00fc b\u00fcy\u00fcmesini s\u00fcrd\u00fcrerek 4.694 MW yeni kurulum ger\u00e7ekle\u015ftirdi. T\u00fcrkiye Elektrik \u0130letim A\u015e (TE\u0130A\u015e) verilerine g\u00f6re bu art\u0131\u015fla birlikte \u00fclkenin toplam kurulu g\u00fcne\u015f g\u00fcc\u00fc 24.795 MW\u2019a ula\u015ft\u0131 ve 25 GW s\u0131n\u0131r\u0131na &#8230;<\/p>\n","protected":false},"author":1,"featured_media":117518,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[137,1360,7039,2482,80],"class_list":["post-117517","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-teknoloji","tag-enerji","tag-gunes-enerjisi","tag-gw","tag-lisans","tag-turkiye"],"_links":{"self":[{"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/posts\/117517","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/comments?post=117517"}],"version-history":[{"count":1,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/posts\/117517\/revisions"}],"predecessor-version":[{"id":117521,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/posts\/117517\/revisions\/117521"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/media\/117518"}],"wp:attachment":[{"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/media?parent=117517"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/categories?post=117517"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/tags?post=117517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}