{"id":118426,"date":"2026-01-16T11:56:07","date_gmt":"2026-01-16T11:56:07","guid":{"rendered":"https:\/\/ekamu.net\/?p=118426"},"modified":"2026-01-16T11:56:07","modified_gmt":"2026-01-16T11:56:07","slug":"zirhli-arac-siparisini-yetistiremeyen-otokara-romanyadan-2-milyon-tl-tazminat","status":"publish","type":"post","link":"https:\/\/ekamu.net\/index.php\/2026\/01\/16\/zirhli-arac-siparisini-yetistiremeyen-otokara-romanyadan-2-milyon-tl-tazminat\/","title":{"rendered":"Z\u0131rhl\u0131 ara\u00e7 sipari\u015fini yeti\u015ftiremeyen Otokar\u2019a Romanya\u2019dan 2 milyon TL tazminat"},"content":{"rendered":"<p><figure> <span> <img decoding=\"async\" src=\"https:\/\/ekamu.net\/wp-content\/uploads\/2026\/01\/zirhli-arac-siparisini-yetistiremeyen-otokara-romanyadan-2-milyon-tl-tazminat-0-gMJ55nQk.jpg\"\/> <\/span> T\u00fcrkiye\u2019nin \u00f6nde gelen savunma sanayi \u015firketlerinden <strong>Otokar<\/strong>, 2024\u2019\u00fcn sonlar\u0131nda Romanya Savunma Bakanl\u0131\u011f\u0131&#8217;na ba\u011fl\u0131 Romtehnica \u015firketiyle 1.059 adet <strong>COBRA II 4&#215;4 Taktik Tekerlekli Z\u0131rhl\u0131 Ara\u00e7<\/strong> sat\u0131\u015f\u0131 i\u00e7in s\u00f6zle\u015fme imzalam\u0131\u015ft\u0131. <\/figure>\n<p>Anla\u015fma kapsam\u0131nda ilk 278 COBRA II arac\u0131n T\u00fcrkiye\u2019de \u00fcretilmesi, geri kalan ara\u00e7lar\u0131n Romanya\u2019da kurulacak yerel tesiste \u00fcretilmesi planlanm\u0131\u015ft\u0131. Teslimat ve yerel \u00fcretime y\u00f6nelik ara hedeflerin yeti\u015ftirilmemesi nedeniyle Romanya, Otokar\u2019dan <strong>yakla\u015f\u0131k 2 milyar TL tutar\u0131nda tazminat<\/strong> talep etti.<\/p>\n<p>Otokar\u2019dan Kamuyu Ayd\u0131nlatma Platformu\u2019na (KAP) yap\u0131lan a\u00e7\u0131klamada, Romtehnica taraf\u0131ndan talep edilen tazminatlar\u0131n \u00f6denece\u011fi duyuruldu. Otokar, toplamda yakla\u015f\u0131k 2 milyar TL\u2019yi bulan bu \u00f6demelerin \u015firketin 2025 y\u0131l\u0131ndaki proje hakedi\u015flerinden mahsup yoluyla netle\u015ftirilerek giderle\u015ftirilece\u011fini belirtti. \u015eirket, mevcut uyu\u015fmazl\u0131klar\u0131n projenin gelece\u011fini olumsuz etkilememesi ve ilave tazminat risklerinin olu\u015fmamas\u0131 ad\u0131na \u00e7\u00f6z\u00fcm odakl\u0131 \u00e7al\u0131\u015fmalar\u0131n s\u00fcrd\u00fc\u011f\u00fcn\u00fc vurgulad\u0131. Ayr\u0131ca T\u00fcrkiye\u2019de \u00fcretilen 194 adet COBRA II arac\u0131n Romanya\u2019ya teslim edildi\u011fi belirtildi.<\/p>\n<p>Otokar, Romtehnica \u015firketiyle 4,3 milyar Rumen Leyi de\u011ferinde s\u00f6zleme imzalam\u0131\u015ft\u0131. Bu tutar\u0131n yakla\u015f\u0131k 200 milyon Rumen Leyi kadarl\u0131k k\u0131sm\u0131 tazminat olarak Romanya&#8217;ya \u00f6denecek.<\/p>\n<p><b>Otokar taraf\u0131ndan KAP&#8217;a yap\u0131lan a\u00e7\u0131klama \u015f\u00f6yle:<\/b><\/p>\n<p>&#8220;\u015eirketimizin 4.10.2024 ve 27.11. 2024 tarihli \u00f6zel durum a\u00e7\u0131klamalar\u0131nda, Romanya Milli Savunma Bakanl\u0131\u011f\u0131&#8217;n\u0131n \u015firketi C.N. Romtehnica S.A.&#8217;n\u0131n (Romtehnica) a\u00e7m\u0131\u015f oldu\u011fu 4&#215;4 Taktik Tekerlekli Hafif Z\u0131rhl\u0131 ara\u00e7 al\u0131m\u0131 ihalesinin \u015eirketimiz lehine sonu\u00e7land\u0131\u011f\u0131; bu kapsamda, Romtehnica&#8217;ya ilk 278 adedi Otokar tesislerinde, kalan k\u0131sm\u0131 ise Romanya&#8217;da \u00fcretilmek \u00fczere toplam 1059 adet 4&#215;4 Taktik Tekerlekli Hafif Z\u0131rhl\u0131 Ara\u00e7 sat\u0131laca\u011f\u0131 ve teslimatlar\u0131n 2025 y\u0131l\u0131 son \u00e7eyre\u011finden ba\u015flamak \u00fczere 5 y\u0131l i\u00e7erisinde tamamlanmas\u0131n\u0131n planland\u0131\u011f\u0131 kamuya a\u00e7\u0131klanm\u0131\u015ft\u0131.<br \/> Romtehnica taraf\u0131ndan, Romanya&#8217;da \u00fcretilecek k\u0131s\u0131m i\u00e7in s\u00f6zle\u015fme takvimindeki yerel \u00fcretim haz\u0131rl\u0131klar\u0131na y\u00f6nelik ara hedeflerin zaman\u0131nda yerine getirilmedi\u011fi iddias\u0131yla, \u015eirketimize toplam 191.847.899,70 Rumen Leyi (g\u00fcncel kurla yakla\u015f\u0131k 1.880 milyon TL) tutar\u0131nda tazminat talebi iletilmi\u015ftir. \u0130lgili talebe ili\u015fkin iptal davas\u0131 a\u00e7\u0131lm\u0131\u015f olup, taraflar aras\u0131nda m\u00fczakereler de s\u00fcrd\u00fcr\u00fclmekle birlikte, yasal haklar\u0131m\u0131z sakl\u0131 kalmak kayd\u0131yla, \u015eirketimizce ilgili tutar vadesinde (bug\u00fcn) \u00f6denecektir.<\/p>\n<p>Di\u011fer taraftan, Otokar tesislerinde \u00fcretilecek ilk parti teslimatlardan bug\u00fcne kadar sat\u0131\u015f\u0131 tamamlanan 194 adet arac\u0131n ge\u00e7 teslim edilmesi nedeniyle de \u015eirketimize ayr\u0131ca toplam 7.295.974,66 Rumen Leyi (g\u00fcncel kurla yakla\u015f\u0131k 72 milyon TL) tutar\u0131nda tazminat talebi iletilmi\u015f olup, yasal haklar\u0131m\u0131z sakl\u0131 kalmak kayd\u0131yla bu tutar\u0131n da Ocak ay\u0131 i\u00e7erisinde \u00f6denmesi \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>\u0130lgili tutarlar\u0131n \u015eirketimizin 2025 y\u0131l\u0131na ili\u015fkin s\u00f6zle\u015fme kapsam\u0131ndaki hak edi\u015flerinden mahsup yoluyla netle\u015ftirilerek giderle\u015ftirilmesi \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>Halihaz\u0131rda ya\u015fanan gecikme ve uyu\u015fmazl\u0131klar\u0131n, projenin devam\u0131n\u0131 da olumsuz etkileme ve ilave tazminat talebine yol a\u00e7ma ihtimali bulunmakla birlikte, uyu\u015fmazl\u0131klar\u0131n \u00e7\u00f6z\u00fcmlenerek s\u00f6zle\u015fmesel y\u00fck\u00fcml\u00fcl\u00fcklerimizin ifas\u0131na devam edilmesi i\u00e7in \u00e7al\u0131\u015fmalar s\u00fcrmektedir.<\/p>\n<p>Romtehnica&#8217;n\u0131n 17.12.2025 ve 24.12.2025 tarihlerinde tebli\u011f al\u0131nan \u00f6deme taleplerinde belirtilen hususlar\u0131n kamuya a\u00e7\u0131klanmas\u0131n\u0131n, taraflar aras\u0131nda y\u00fcr\u00fct\u00fclecek m\u00fczakerelerde \u015eirketimizin me\u015fru \u00e7\u0131karlar\u0131na zarar verebilece\u011fi ve taraflar aras\u0131ndaki m\u00fczakere sonucuna ba\u011fl\u0131 olarak de\u011fi\u015fme ihtimali bulunan ko\u015fullar\u0131n a\u00e7\u0131klanmas\u0131n\u0131n yat\u0131r\u0131mc\u0131lar\u0131 yan\u0131ltabilece\u011fi dikkate al\u0131narak, Sermaye Piyasas\u0131 Kurulu&#8217;nun \u00d6zel Durumlar Tebli\u011fi \u00e7er\u00e7evesinde m\u00fczakere s\u00fcrecinin tamamlanmas\u0131na kadar ertelenmesine karar verilmi\u015ftir. Gelinen a\u015famada gizlilik sa\u011flanamayaca\u011f\u0131ndan erteleme ko\u015fullar\u0131n\u0131n ortadan kalkmas\u0131 nedeniyle i\u015fbu a\u00e7\u0131klama yap\u0131lmaktad\u0131r. S\u00fcrece ili\u015fkin \u00f6nemli geli\u015fmeler kamuya a\u00e7\u0131klanacakt\u0131r.&#8221;<\/p>\n\n<p><span style=\"display: block; width: 343.125px; color: rgb(55, 58, 60); font-size: 14px; background-color: rgb(255, 249, 236);\"><\/span><\/p>\n<p>Kaynak :\u00a0<span style=\"background-color: rgb(255, 249, 236); color: rgb(55, 58, 60); font-size: 14px;\">https:\/\/www.donanimhaber.com\/siparisi-yetistiremeyen-otokar-a-romanya-dan-2-milyon-tl-tazminat&#8211;200950<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>T\u00fcrkiye\u2019nin \u00f6nde gelen savunma sanayi \u015firketlerinden Otokar, 2024\u2019\u00fcn sonlar\u0131nda Romanya Savunma Bakanl\u0131\u011f\u0131&#8217;na ba\u011fl\u0131 Romtehnica \u015firketiyle 1.059 adet COBRA II 4&#215;4 Taktik Tekerlekli Z\u0131rhl\u0131 Ara\u00e7 sat\u0131\u015f\u0131 i\u00e7in s\u00f6zle\u015fme imzalam\u0131\u015ft\u0131. Anla\u015fma kapsam\u0131nda &#8230;<\/p>\n","protected":false},"author":1,"featured_media":118427,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[5893,5892,7080,1487,5993],"class_list":["post-118426","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-teknoloji","tag-otokar","tag-romanya","tag-romtehnica","tag-sirketi","tag-tazminat"],"_links":{"self":[{"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/posts\/118426","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/comments?post=118426"}],"version-history":[{"count":1,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/posts\/118426\/revisions"}],"predecessor-version":[{"id":118429,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/posts\/118426\/revisions\/118429"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/media\/118427"}],"wp:attachment":[{"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/media?parent=118426"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/categories?post=118426"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ekamu.net\/index.php\/wp-json\/wp\/v2\/tags?post=118426"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}